<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Mar Azul | Project Management</title>
	<atom:link href="https://marazul.com.pa/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://marazul.com.pa/en/</link>
	<description>Consultoría especializada en gerencia e interventoría de proyectos de construcción.</description>
	<lastBuildDate>Thu, 22 Jun 2023 14:11:07 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://marazul.com.pa/wp-content/uploads/cropped-MarAzul-Logo-05-32x32.png</url>
	<title>Mar Azul | Project Management</title>
	<link>https://marazul.com.pa/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Getting to know Carlos Gonzalez</title>
		<link>https://marazul.com.pa/en/getting-to-know-carlos-gonzalez/</link>
					<comments>https://marazul.com.pa/en/getting-to-know-carlos-gonzalez/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 21 Jun 2023 14:00:38 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/getting-to-know-carlos-gonzalez/</guid>

					<description><![CDATA[<p>On this occasion we will meet Carlos Gonzalez, technical inspector at Mar Azul Projects. Everyone who knows this charismatic Chiricano knows how jovial and dynamic he is, who defines himself as happy, fun and adventurous. Carlos tells us that outside of work, he loves spending time with his family, riding a bicycle, and traveling. Regarding...</p>
<p>La entrada <a href="https://marazul.com.pa/en/getting-to-know-carlos-gonzalez/">Getting to know Carlos Gonzalez</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On this occasion we will meet Carlos Gonzalez, technical inspector at <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>. Everyone who knows this charismatic Chiricano knows how jovial and dynamic he is, who defines himself as happy, fun and adventurous.</p>
<p>Carlos tells us that outside of work, he loves spending time with his family, riding a bicycle, and traveling.</p>
<p>Regarding studies and first work experiences, we can share that Carlos studied a Bachelor&#8217;s Degree in Buildings and has vast experience in the construction industry. From his first experiences he shares a very special one, where he was part of the construction of the Maternal and Child Hospital in David, Chiriquí.</p>
<h2>About Mar Azul</h2>
<p>We asked him, within his experience and work at <span data-text-color="primary"><strong>Mar Azul</strong></span>, what is he most passionate about. Carlos answered us: &#8220;In this profession, you learn something new every day and I am passionate about that, because no day is the same as another, giving me the opportunity to continue growing as a person and a professional.&#8221; He added that for him, the use of the Procore tool has been an enriching experience that allows him to make contributions in terms of the inspection process: &#8220;It is a super complete tool in terms of the field of construction.&#8221;</p>
<p>For Carlos, challenges always exist. &#8220;Life is a challenge, but you always have to keep moving forward&#8221; and he proceeds to share with us a situation that he experienced and represented a valuable lesson for him: &#8220;I had a knee injury two years ago and this showed me that there are no physical, emotional, nor mental limitations; everything is possible with effort, determination, and giving thanks to our creator”.</p>
<h2>Experiences</h2>
<p>A very special experience in the years that Carlos has been working with <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>: &#8220;(laughing) There is a world of stories in my environment and in my years in this company, but one that I always remember is of when I had recently started working here. On my first day in the field, I had to get on a boatswain&#8217;s chair and a single-mast structure for exterior inspection of the façade in the Santa Maria Court tower, as well as the elevation and installation of pressurization motors on the roof, also in the tower.”</p>
<p>With all his years and experiences, we asked him to give us some valuable advice and five keys to achieve his proposed objectives. He mentioned to us that his best advice would be to “persevere, continue studying and continue cultivating fruits in the professional and personal field. Set goals.” His five keys to success are:</p>
<p>→ Give thanks to God for everything;<br />→ Maintain high self-esteem;<br />→ Fight for your goals both personally and professionally;<br />→ Be gentle, kind and humble; and<br />→ Be willing to learn since every day, you learn something new.</p>
<p>La entrada <a href="https://marazul.com.pa/en/getting-to-know-carlos-gonzalez/">Getting to know Carlos Gonzalez</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/getting-to-know-carlos-gonzalez/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Importance of having an expert advisor in finishes</title>
		<link>https://marazul.com.pa/en/importance-of-having-an-expert-advisor-in-finishes/</link>
					<comments>https://marazul.com.pa/en/importance-of-having-an-expert-advisor-in-finishes/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 07 Jun 2023 14:00:59 +0000</pubDate>
				<category><![CDATA[Business]]></category>
		<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Hospitality]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Residential]]></category>
		<category><![CDATA[Residential complexes]]></category>
		<category><![CDATA[Services]]></category>
		<category><![CDATA[Trends]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/importance-of-having-an-expert-advisor-in-finishes/</guid>

					<description><![CDATA[<p>When undertaking a construction project, be it a home, a commercial premises or any other type of building, it is essential to pay attention to the details that will make the difference in terms of its aesthetics and functionality. The finishes, from lighting and furniture to coverings, doors, closets, and windows, play a key role...</p>
<p>La entrada <a href="https://marazul.com.pa/en/importance-of-having-an-expert-advisor-in-finishes/">Importance of having an expert advisor in finishes</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>When undertaking a construction project, be it a home, a commercial premises or any other type of building, it is essential to pay attention to the details that will make the difference in terms of its aesthetics and functionality. The finishes, from lighting and furniture to coverings, doors, closets, and windows, play a key role in the final result of the work. In this sense, having an expert advisor on construction projects, such as <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, becomes crucial.</p>
<p>One of the most prominent benefits of working with a consultant is, without a doubt, the experience and specialized knowledge that they bring to the finish selection process. <span data-text-color="primary"><strong>Mar Azul Projects</strong></span> has highly trained professionals who understand the quality and functionality of different types of finishes, thus supporting the best selection at the time of purchase of these materials, and adding knowledge about the latest technological innovations in terms of materials and systems. . This allows us to advise accurately and provide personalized recommendations for each particular project.</p>
<p>Choosing the right finishes has a significant impact on the functionality and durability of a building. This is when —as an advisor— the specific needs of each space can be evaluated, considering both the design line and other influencing factors, such as natural lighting, expected traffic, and local climate, among other relevant aspects. With this information, the most appropriate materials and systems can be recommended, guaranteeing that the selected finishes meet quality standards and fit within the established budget.</p>
<p>Another advantage of working with an advisor is the optimization of resources. The proper choice of finishes can help maximize energy efficiency, reduce maintenance costs, and improve user comfort. <span data-text-color="primary"><strong>Mar Azul Projects</strong></span> has vast experience in different types of projects for which it has provided the best choice of materials: efficient lighting, durable coatings suitable for each traffic, thermal and acoustic insulation, and even in the choice of doors and windows that favor energy saving, acoustic comfort, and aesthetics.</p>
<p>Another great value in working with subject matter experts is simplifying the decision-making process. The variety of options on the market can be overwhelming for those unfamiliar with the world of construction. <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, as an experienced advisor, can present a selection of finishes that fit the client&#8217;s style and preferences, thus avoiding the loss of time and resources in the search for inappropriate alternatives.</p>
<p>In summary, the choice of finishes in a construction project is a fundamental aspect that should not be left to chance. Having an expert advisor, such as <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, provides the assurance that the selected finishes will be functional, aesthetically pleasing, and in accordance with the needs and expectations of our clients. Our specialized knowledge, experience, and ability to optimize resources make investing in a consultant an intelligent decision that will be reflected in the final result of the construction.</p>
<p>La entrada <a href="https://marazul.com.pa/en/importance-of-having-an-expert-advisor-in-finishes/">Importance of having an expert advisor in finishes</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/importance-of-having-an-expert-advisor-in-finishes/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>How to define if your project is feasible?</title>
		<link>https://marazul.com.pa/en/how-to-define-if-your-project-is-feasible/</link>
					<comments>https://marazul.com.pa/en/how-to-define-if-your-project-is-feasible/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 24 May 2023 14:00:17 +0000</pubDate>
				<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/how-to-define-if-your-project-is-feasible/</guid>

					<description><![CDATA[<p>At Mar Azul Projects, we understand the importance of incorporating a pre-feasibility process before beginning any construction project. This process allows us to evaluate the viability of the project and determine if it is feasible to carry it out, taking into account factors such as location, cost, time, and other resources necessary. The benefits of...</p>
<p>La entrada <a href="https://marazul.com.pa/en/how-to-define-if-your-project-is-feasible/">How to define if your project is feasible?</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>At <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, we understand the importance of incorporating a pre-feasibility process before beginning any construction project. This process allows us to evaluate the viability of the project and determine if it is feasible to carry it out, taking into account factors such as location, cost, time, and other resources necessary.</p>
<p>The benefits of a pre-feasibility process are many. First of all, it allows us to evaluate its feasibility of execution before investing large amounts of money in the project. This can avoid unnecessary costs and financial risks in the long run.</p>
<p>In addition, a well-executed pre-feasibility process can help us identify areas where we can reduce costs and maximize benefits, allowing us to know if the project will be profitable in the long term. It also helps us anticipate and prevent potential roadblocks or risks, reducing the likelihood of costly delays or unforeseen events.</p>
<p>A pre-feasibility process begins with an assessment of the project&#8217;s location. An example of how to start would be, in the case of a tourism project, evaluating whether the construction project is located in complex areas, such as coastal or tourist areas, where the accessibility of the location is reviewed and whether it is attractive to tourists and visitors. And so for each type of project, it is analyzed according to its characteristics.</p>
<p>In this line, once the location has been evaluated, a cost-benefit analysis of the project is carried out. This analysis makes it possible to determine, at the monetary level, if the project will be profitable and if the costs associated with the project will be justified by the benefits that will be obtained.</p>
<p>At <span data-text-color="primary"><strong>Mar Azul Projects</strong></span> we focus on reviewing these costs, seeking to contribute and have a high-quality project that is sustainable and respectful of the environment, which in the long term results in significant savings in operation and maintenance costs. Another important factor in the pre-feasibility process is the evaluation of the time and resources needed to carry out the project. As experts in value engineering, we evaluate each of the stages, schedule and the necessary resources to be required during the execution of the work.</p>
<p>Based on our experience, we consider the pre-feasibility process as an essential part of planning any construction project. And in its effect, this process allows evaluating its feasibility, resulting in being able to guarantee profitable and sustainable projects in the long term.</p>
<p>La entrada <a href="https://marazul.com.pa/en/how-to-define-if-your-project-is-feasible/">How to define if your project is feasible?</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/how-to-define-if-your-project-is-feasible/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Efficiencies in earthworks</title>
		<link>https://marazul.com.pa/en/efficiencies-in-earthworks/</link>
					<comments>https://marazul.com.pa/en/efficiencies-in-earthworks/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 10 May 2023 14:00:34 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/efficiencies-in-earthworks/</guid>

					<description><![CDATA[<p>Some projects, such as the construction of roads, buildings, bridges, and other infrastructure, require earthworks. These activities can be very expensive and complex, so the best decisions must be made in the early stages of the project to avoid high costs that may affect its development in the future. First of all, it is important...</p>
<p>La entrada <a href="https://marazul.com.pa/en/efficiencies-in-earthworks/">Efficiencies in earthworks</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Some projects, such as the construction of roads, buildings, bridges, and other infrastructure, require earthworks. These activities can be very expensive and complex, so the best decisions must be made in the early stages of the project to avoid high costs that may affect its development in the future.</p>
<p>First of all, it is important to carry out a careful evaluation of the terrain before beginning any earthmoving work. This includes both carrying out topographic, geotechnical and environmental studies as well as evaluating the costs and deadlines of the project. This evaluation will make it possible to identify the risks and challenges of the project and make the appropriate decisions to address them.</p>
<p>In our experience, we have noticed that many of the failures come from the misuse of fill materials and the lack of quality tests regarding its compaction. For this reason, in <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, inspection and planning are vital in order to mitigate this typical construction risk.</p>
<p>It is also important to select the right tools and equipment for the job. These can cause damage to the land and increase project costs. For example, operating heavy machinery on soft or wet ground can cause ground damage and increase repair costs.</p>
<p>Proper planning of the project logistics must also be taken into account to reduce transportation and storage costs which, in turn, improves the efficiency of the project.</p>
<p>Having the advice of an expert in engineering and project management, such as <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, provides you with the knowledge and experience necessary both to carry out detailed evaluations of the land and to identify risks and challenges of the project, guaranteeing that the decisions made in the early stages of the project are the best to save costs and avoid problems in the future. In addition, this advice can help avoid costly mistakes and ensure that the project is completed on time and within budget.</p>
<p>We can conclude that expert advice is vital to make the best decisions in projects that involve earthworks, providing the experience and knowledge necessary for the project to be completed on time and within budget.</p>
<p>La entrada <a href="https://marazul.com.pa/en/efficiencies-in-earthworks/">Efficiencies in earthworks</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/efficiencies-in-earthworks/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Getting to know Aura Quintana</title>
		<link>https://marazul.com.pa/en/getting-to-know-aura-quintana/</link>
					<comments>https://marazul.com.pa/en/getting-to-know-aura-quintana/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 19 Apr 2023 14:00:20 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/getting-to-know-aura-quintana/</guid>

					<description><![CDATA[<p>We are going to introduce you to one of our expert architects in finishes, Aura Quintana, who has been collaborating with Mar Azul for several years now. Graduated as an architect, her first experience in building was a luxury house in the Punta Barco area. She remembers that, since this project was her first work...</p>
<p>La entrada <a href="https://marazul.com.pa/en/getting-to-know-aura-quintana/">Getting to know Aura Quintana</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We are going to introduce you to one of our expert architects in finishes, Aura Quintana, who has been collaborating with <span data-text-color="primary"><strong>Mar Azul</strong></span> for several years now. Graduated as an architect, her first experience in building was a luxury house in the Punta Barco area. She remembers that, since this project was her first work experience, it felt like a huge challenge but that —in addition— the complexity of arriving at the site not owning a vehicle at that time, implied traveling by public transport and getting up early at three in the morning to be on time. «It was difficult but, like everything, it was part of the learning and the sacrifices.»</p>
<h2>What is Aura like outside the workplace?</h2>
<p>Outside of her professional life, she defines herself as a humble, collaborative, and proud person. She also shares with us that, in her free time, she likes to spend time with her daughter in outdoor activities, she really enjoys watching series on Netflix and, laughingly, she tells us that «when you are the mother of a little girl, you don&#8217;t have much time for yourself. Now I have to drink tea, play dolls, and build lava paths.»</p>
<h2>About Mar Azul</h2>
<p>In the workplace, we asked Aura to share what she is most passionate about: «Something always really gratifying is completing a project and making the client feel satisfied.» For Aura, who has had the experience of working on multiple and varied projects, patience has been her greatest challenge since —as we know— direct contact with clients is not an easy task, «There are many things that you have to know how to handle and you must always present yourself with a huge smile.»</p>
<p>Within your career at <span data-text-color="primary"><strong>Mar Azul</strong></span>, what do you consider to have been your greatest lesson? «Definitely, it has been dealing with clients, because it is very difficult to be 100% good; even more so when you depend on the work of third parties. Therefore, even if you give everything in what you do, there will always be something that cannot be controlled. It has also taught me to put myself on the other side when I go to places and they give me good or bad service, because many times I was one of those clients who complained about everything and it really is very different when you are on the other side.»</p>
<h2>An anecdote from these years working with Mar Azul?</h2>
<p>«I remember that I made an order for some metal doors for a project fifteen days after what the schedule established and that did not let me sleep for about two nights. When I said well, the doors are not going to arrive in time, they told me not to worry, that all was going to be alright. I mean, after that I just sat around laughing and that stuck in my mind so much that I always remember it. It was a lesson learned.»</p>
<h2>Any advice or experience that you want to share with us?</h2>
<p>«Throughout time I have learned to organize myself more, to be patient, and to know that things happen. I have accepted that, although one tries by all means to avoid delays, everything takes time and that many times, asking for help is not bad.»</p>
<p>To conclude, what do you consider to be the five keys to achieving both professional and personal goals?</p>
<p>→ Dedication;<br />→ Sacrifice;<br />→ Affection for the things you do;<br />→ Humbleness, y<br />→ Knowing how to communicate.</p>
<p>La entrada <a href="https://marazul.com.pa/en/getting-to-know-aura-quintana/">Getting to know Aura Quintana</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/getting-to-know-aura-quintana/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Project permits</title>
		<link>https://marazul.com.pa/en/project-permits/</link>
					<comments>https://marazul.com.pa/en/project-permits/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 12 Apr 2023 14:00:40 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/project-permits/</guid>

					<description><![CDATA[<p>Today we will share with you, from our perspective as administrators with experience in all stages of a project, an important issue at the time of executing it: permits with government entities and our recommendation to process them. In general terms, the main permits that are required in a construction project in Panama must be...</p>
<p>La entrada <a href="https://marazul.com.pa/en/project-permits/">Project permits</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Today we will share with you, from our perspective as administrators with experience in all stages of a project, an important issue at the time of executing it: permits with government entities and our recommendation to process them.</p>
<p>In general terms, the main permits that are required in a construction project in Panama must be processed with the municipality and the fire department of the corresponding area. The order that we recommend following, considering that it is the most appropriate and organized way to comply with what the law requires, would be the following:</p>
<p>a. Submit and approve a draft plan;</p>
<p>b. Submit and approve a construction plan that includes all the designs of the specialties, such as architecture, structure, electromechanics, signaling, alarm, among others;</p>
<p>c. Request an appraisal of the cost for the project, according to approved plans and pay the construction tax, called Construction Permit;</p>
<p>d. During the project, other types of permits are requested, such as the sidewalk permit (if you build adjacent and very incident to a pedestrian crossing area), the crane permit, the forklift permit, etc. and</p>
<p>e. For the final stages of the project, the occupancy permit must be requested, with which the building can operate for the purpose it was intended for.</p>
<p>Basically, the permits do not vary by the type of project since, regardless of the activity, the same procedure listed must be carried out. What is important to mention is that building in a specific area requires the land use or classification that said area has. For example, you cannot build an office building in a residential area. Another variation occurs in the case of permits that have to do with the impact that the project will have on the environment. For this, it is required that every project have an Environmental Impact Study that includes the different categories.</p>
<p>It is extremely important that the client have all the legal documentation of the company that owns the project and the land on which said project will be built. The client must also be financially prepared to face the different initial costs that this stage entails.</p>
<p>Another valuable recommendation is that the architect and the client validate all the information and the scope of their project so that this is reflected in the plans and can thus confirm land use, previous studies of the area (environmental impact study, hydrological, etc.) as well as the preparation of all the plans that will be submitted in the draft (general concept of the project).</p>
<p>From our experience and perspective as project management, we hold follow-up meetings, even weekly, with the architects (for any change) or the person named as processor, who is in charge of the follow-up between the different departments of the municipality and the fire department. In addition, when a signature, documentation issuance by the project owner or any tax payment is required, we take care of processing it, to meet the requirements on time and as requested by each entity.</p>
<p>To conclude, we know that a delayed or undone procedure brings with it multiple actions that can affect the project, which is why it is imperative to always keep these processes in mind and be prepared for them to avoid delays or fines to the project.</p>
<p>La entrada <a href="https://marazul.com.pa/en/project-permits/">Project permits</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/project-permits/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Leap to technology: integration and efficiency</title>
		<link>https://marazul.com.pa/en/leap-to-technology-integration-and-efficiency/</link>
					<comments>https://marazul.com.pa/en/leap-to-technology-integration-and-efficiency/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 22 Mar 2023 14:00:52 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<category><![CDATA[Trends]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/leap-to-technology-integration-and-efficiency/</guid>

					<description><![CDATA[<p>The world and societies evolve. This goes hand in hand with technology and the need to meet objectives more efficiently. The construction sector does not escape this evolution, so we want to share a little about how our process of adaptation to new systems and trends has been, from our perspective of project management. For...</p>
<p>La entrada <a href="https://marazul.com.pa/en/leap-to-technology-integration-and-efficiency/">Leap to technology: integration and efficiency</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The world and societies evolve. This goes hand in hand with technology and the need to meet objectives more efficiently. The construction sector does not escape this evolution, so we want to share a little about how our process of adaptation to new systems and trends has been, from our perspective of project management.</p>
<p>For us, in a simple way, efficiency is doing things well in the shortest possible time, optimizing the use of resources. This is how in recent years we have achieved an implementation of cleaner, more efficient, and highly specified construction systems, which has allowed us to be at the forefront of the requirements requested by our clients or transnational entities. This has allowed us to be competitive and to contribute greatly to the projects in which we have participated.</p>
<p>In the construction sector —one of the areas where we can see the evolution of technology and the search for efficiency— and more specifically, in the areas of design and architecture, everything points to the use of BIM technology and its adaptation to the local market. It should be noted that an attempt should be made to promote this technology to clients in the simplest and easiest way that allows them to understand the efficiency involved in carrying out correct project planning.</p>
<p>As project managers, we also see it through the use of technology in tools. It is a widely developed field that makes it possible to obtain even greater benefits in the construction industry and that can still provide many additional advantages, but in which for various reasons (costs or consultancy) it often happens that the information or data that can be achieved with these devices, is not exploited.</p>
<p>At <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, we have been pioneers in the use of the <strong>Procore</strong> construction platform, which is a state-of-the-art tool that provides us with both efficiency in real-time data management and comfort in the execution of a work. Next, five main benefits that we obtain with the use of this tool:</p>
<ol>
<li>Efficiency in inspection time;</li>
<li>More practical ways to work collaboratively, using digital tools;</li>
<li>Processes integrated with the practical management of construction administration and inspection;</li>
<li>Practicality to obtain authorizations and/or signatures regardless of the physical position of the person; and</li>
<li>Adaptability and flexibility in handling a high volume of documentation, as well as easily accessible and supported information.</li>
</ol>
<p>As in all areas, adapting to new technologies, tools or systems always entails challenges from which no one escapes. Therefore, from our experience, here are the three that we consider the most relevant challenges:<br />→ Identify the correct tool;<br />→ Cost of the tool and implementation; and<br />→ Implementation plan and power of persuasion with the human staff that will use the tool.</p>
<p>The changes will continue. We positively see the new areas where technology is migrating, so we invite the construction sector to get involved and be interested in two extremely interesting and important fields, such as the implementation of 3D printers in construction, since it allows jobs to be carried out faster, with higher quality and in a cleaner and more efficient way, as well as sustainable construction, which is very important not only for the future of the industry, but also for our planet. Considering that resources are limited, we must focus on their best use and interact with nature, respecting and caring for it.</p>
<p>We know there is much more to do. It is a long road, but very promising, so we will continue to search for, integrate, and encourage technologies that allow us to continue increasing our efficiency and stay at the forefront of our projects.</p>
<p>La entrada <a href="https://marazul.com.pa/en/leap-to-technology-integration-and-efficiency/">Leap to technology: integration and efficiency</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/leap-to-technology-integration-and-efficiency/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>What is a Test Fit?</title>
		<link>https://marazul.com.pa/en/what-is-a-test-fit/</link>
					<comments>https://marazul.com.pa/en/what-is-a-test-fit/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 08 Mar 2023 14:00:46 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Trends]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/what-is-a-test-fit/</guid>

					<description><![CDATA[<p>An increasingly used term in architecture and construction is the Test Fit. But what is it, what does it consist of and why use it? Let us share with you some information about this friendly solution. In summary, the Test Fit is an analysis process that is used so that —in a preliminary way— the...</p>
<p>La entrada <a href="https://marazul.com.pa/en/what-is-a-test-fit/">What is a Test Fit?</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>An increasingly used term in architecture and construction is the Test Fit. But what is it, what does it consist of and why use it? Let us share with you some information about this friendly solution.</p>
<p>In summary, the Test Fit is an analysis process that is used so that —in a preliminary way— the use of a space can be visualized. In turn, this allows decisions to be made and a design to be much more aligned with the tastes and needs of the client, as well as the size of the place, proving that all the components fit within this space. It is done in conjunction with the designer and the client, resulting in a more efficient and much clearer design for a specific client.</p>
<p>It is important to understand the space requirements of the client and, in the same way, to comprehend their daily operation so that the design is consistent with the operation of the company, which is exactly what is sought to be achieved through a Test Fit. It also helps to better use the resources of a remodeling, a gray space or a new office, it helps to use the budget in the most efficient way, anticipating all the details and requirements, already based and aligned with the operation of the company that will be in execution in that new space.</p>
<p>In our experience with commercial projects, especially in the area of corporate offices, we have had the opportunity to experience how much value this process provides by helping us to clearly understand what is required by each of our clients and to avoid letting details slip that could only be seen when the site is  already in operation. It also influences the schematic design phase as all parties test and examine the space plan.</p>
<p>Making the decision to run a Test Fit process is always a good idea, it&#8217;s a simple and fast process that does a lot, giving you a clear idea of the functionality of your future workspace, without exorbitant costs.</p>
<p>What do you need to start this process? Once the decision to carry it out is made, you only need:<br />→ Empty architectural plan to use as a base;<br />→ Essential requirements of the client in terms of spaces;<br />→ Approximate footage per space (if this information is available);<br />→ Company organization chart; and<br />→ Contact with the person in the company who sees and understands the daily operations.</p>
<p>In conclusion, once a Test Fit is done, those involved can see, react, and respond to the space plan prior to a final design and help guide all solutions for the full functionality of the future workspace.</p>
<p>La entrada <a href="https://marazul.com.pa/en/what-is-a-test-fit/">What is a Test Fit?</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/what-is-a-test-fit/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Getting to know Jonahan Castillo</title>
		<link>https://marazul.com.pa/en/getting-to-know-jonahan-castillo/</link>
					<comments>https://marazul.com.pa/en/getting-to-know-jonahan-castillo/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 22 Feb 2023 14:00:19 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/getting-to-know-jonahan-castillo/</guid>

					<description><![CDATA[<p>On this occasion we will meet Jonahan Castillo, who has been working at Mar Azul for several years in multiple and outstanding projects as a project engineer. Always with a genuine personality and a smile that makes him stand out from the whole team, this charismatic man from Herrera defines himself as a friendly, humble...</p>
<p>La entrada <a href="https://marazul.com.pa/en/getting-to-know-jonahan-castillo/">Getting to know Jonahan Castillo</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>On this occasion we will meet Jonahan Castillo, who has been working at <span data-text-color="primary"><strong>Mar Azul</strong></span> for several years in multiple and outstanding projects as a project engineer. Always with a genuine personality and a smile that makes him stand out from the whole team, this charismatic man from Herrera defines himself as a friendly, humble and persistent person.</p>
<p>Jonahan is a graduate of Civil Engineering at the Technological University of Panama, achieving his first experiences in the field of civil engineering, from the basics, —as he tells us— carrying out quality control work and soil studies. From there he went on to work in the construction of high-end residential housing, then in residential and commercial buildings.</p>
<h2>What is Jonahan like outside of the workplace?</h2>
<p>He tells us that in his free time, he tends to have family barbecues, enjoy his children, go to the beach, go for walks in the fresh air, and watch movies. He also really enjoys learning a new skill.</p>
<p>What has most represented a change in his life was the fact of being a father again: «When my son was born, the first thing he did was pout with his mouth and it is something that is recorded in your mind. This taught me to value my parents&#8217; efforts towards us even more, since you see yourself in that role, in which you know that you have to take care of someone above all things, transmit values in the midst of a society that today day is short of them, which becomes a very difficult task but surely, with work and support from my wife, we will achieve it.</p>
<h2>About Mar Azul</h2>
<p>Jonahan has been working as part of our team since 2018 in many successful projects. He also has many years of previous experience in the construction sector. For this reason, we asked him about what he is most passionate about in his work in the sector. This was his response: «Each new lesson learned that having completed a project leaves you and the expectation of improving on the next one.&#8221;</p>
<p>Within your career in this company, what has been an important experience? «At  <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, we had the opportunity to implement a quality management system where everything is duly documented through each of the protocols that are carried out in the different stages and/or disciplines that make up a certain project, and this is something that you do not find in all the companies in the sector. It entails a challenge, but the teaching and discipline that it gives you is invaluable.»</p>
<h2>An experience or anecdote from these years working with Mar Azul?</h2>
<p>«When I applied to work at <span data-text-color="primary"><strong>Mar Azul Projects</strong></span>, they asked me if I knew anyone in the company and my answer was a resounding no because, until then, I didn&#8217;t know anyone here. However, it turns out that the person who would interview me later was a classmate from school and university (today she no longer works with us) and the engineer whom I would replace was also known to me from the university. Today, that person returned and we shared in the development of a new project.»</p>
<h2>What advice would you share with us?</h2>
<p>In your years of experience in the sector and your experience with all kinds of personalities, do you have any advice that you would like to share with us? «Without a doubt: You can be whatever you want to be.»</p>
<p>In your years of experience in the sector and your experience with all kinds of personalities, do you have any advice that you would like to share with us?</p>
<p>To conclude, what do you consider to be the five keys to achieving both professional and personal goals?</p>
<p>«In both facets I believe that, to achieve any objective,</p>
<p>→ the first thing you have to do is visualize yourself fulfilling it and feeling the excitement of achieving it;</p>
<p>→ then, you must propose how you are going to achieve it through a brainstorming session from which you will select how to do it;</p>
<p>once the how has been identified, then you must define in what time you are going to achieve it and what processes, activities or stages you must complete to reach that objective, establishing dates or times for each one of them;</p>
<p>→ then you must follow up on this planning and measure whether you are doing what is arranged to comply with the plan that you have already drawn up;</p>
<p>→ and last but not least, be persistent. If you stray along the way, focus again on what you will feel when you achieve that goal, so that you can resume actions until you see the goal accomplished. And accompany these five objectives with a celebration, do the lessons learned exercise, and continue with new objectives.»</p>
<p>La entrada <a href="https://marazul.com.pa/en/getting-to-know-jonahan-castillo/">Getting to know Jonahan Castillo</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/getting-to-know-jonahan-castillo/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Importance of involving an electromechanic in a project</title>
		<link>https://marazul.com.pa/en/importance-of-involving-an-electromechanic-in-a-project/</link>
					<comments>https://marazul.com.pa/en/importance-of-involving-an-electromechanic-in-a-project/#respond</comments>
		
		<dc:creator><![CDATA[Mar Azul]]></dc:creator>
		<pubDate>Wed, 08 Feb 2023 14:00:56 +0000</pubDate>
				<category><![CDATA[Management]]></category>
		<guid isPermaLink="false">https://marazul.com.pa/importance-of-involving-an-electromechanic-in-a-project/</guid>

					<description><![CDATA[<p>We have shared with you before about the importance of having an electromechanical engineer on site, since situations can arise at any of the edges or stages of the project. On this occasion, we share the main reasons for such importance, highlighting two key stages in a construction work: the closure of the project and...</p>
<p>La entrada <a href="https://marazul.com.pa/en/importance-of-involving-an-electromechanic-in-a-project/">Importance of involving an electromechanic in a project</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We have shared with you before about the importance of having an electromechanical engineer on site, since situations can arise at any of the edges or stages of the project. On this occasion, we share the main reasons for such importance, highlighting two key stages in a construction work: the closure of the project and its start-up.</p>
<p>The involvement of the electromechanical engineer in these two stages is considered a very good practice. Being able to count on the site —at the time of project closure— with an expert in all these systems provides us, without a doubt, incalculable support since it contributes in this crucial stage both to the validation that all the systems comply with current regulations, as indicated by its design, such as to guarantee that at the time of commissioning, attesting or acceptance before the authorities, everything is in the correct way, in order to culminate with a final and successful delivery of the project to the clients.</p>
<p>Another value that is generated from the transition or start-up process is the training of the operational team, which takes place during the acceptance and receipt stage, and in which it is important that the systems are duly commissioned and audited. In this way, the personnel in charge of the operation of the product or service, have the capacity to handle all the systems that were executed in the project with the due feedback from the personnel that installed each one of the systems within the project. Only in this way can they know in detail all the unique intimacies that each project has.</p>
<p>In the other sense, not having this figure in these stages can bring negative impacts, since it can generate various setbacks, unnecessary changes, and security problems in the project. A risk, which should always be the main reason in the electromechanical part as well as in any project, is human safety; for this reason, it is important that electromechanical personnel have critical personnel by specialty or electromechanical personnel on site.</p>
<h2>Our electromechanical experience in successful projects: Liberty and Sofitel</h2>
<p>The <strong>Liberty</strong> project was a gratifying experience in which we found ourselves with a lightweight wall system, different from what we normally deal with. Another differentiation was that, from the beginning, the client opted for a good evaluation and selection of premises where many important points were taken into consideration, among which, variables such as the efficiency of the construction material and the orientation to the sun, designed to have energy savings in air conditioning systems, stand out. We cannot fail to mention that this accompaniment highlighted the good form and communication of the different actors: client, contractors, suppliers, designers and, on our part, the entire team of specialists from <span data-text-color="primary"><strong>Mar Azul</strong></span>, as project administrator, which contributed greatly to our customer success and satisfaction.</p>
<p>The <strong>Sofitel Legend</strong> project was a renewing and rewarding experience, since it was a rather atypical project that, without a doubt, has been a great challenge, with amazing results. The topic of electromechanics was no exception, since it maintained activities that were being carried out in parallel and with different stages within the life of the project, so the approach to manage the completion of the work was complex.</p>
<p>Being able to make all these electromechanical systems comply, allowed the project to be executed in the shortest possible time. Having years of experience working with high quality standards was of an even significant value for <span data-text-color="primary"><strong>Mar Azul</strong></span>, especially in this project that stands out for being ultra-luxury with brand standards and high expectations from all stakeholders. Added to its complexity as a project itself, it required a greater and dedicated effort in details and our constant focus to ensure the project would be completed to everyone&#8217;s satisfaction. Achievement that we feel satisfied to have fulfilled according to the expectations set.</p>
<p>To recap, being able to count on an electromechanical engineer throughout a project greatly contributes to guaranteeing its closure and successful start-up. It can also have positive impacts on the improvement of a project or within a value engineering in previous stages, such as in the bidding of the project, when resolving conflicts with other systems during the execution of the project, and in monitoring the systems to ensure compliance with current regulations and design.</p>
<p>All of this leads to a successful, efficient and fast closure of the project and start-up. But, if we cannot count on this figure from the beginning, we can share two suggestions to obtain an effective closure and start-up. The first is that the person (or group of people) who will operate the product or service be involved during the acceptance and receipt stage of the project to make it easier for the person in charge of these activities and to achieve a shorter learning curve. . Second, that the necessary tools are available to facilitate the operation of the product or service.</p>
<p>La entrada <a href="https://marazul.com.pa/en/importance-of-involving-an-electromechanic-in-a-project/">Importance of involving an electromechanic in a project</a> se publicó primero en <a href="https://marazul.com.pa/en/">Mar Azul | Project Management</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://marazul.com.pa/en/importance-of-involving-an-electromechanic-in-a-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
